VCenter Upgrade
We are looking at upgrading our recovery hypervisor from VMWare 6.5.0.10000 Build 5973321 to probably Version 6.7.0.30000 or later. Is there any precautions or steps we have to take in order to ensure we don’t break any components in Zerto or lose any data/checkpoints?
-
People: 2
Replies: 1 - November 14, 2019
-
ZVM OS upgrade from Win 2008
Hello, Can ZVM support the in-place upgrade of the OS from Win2008 to 2012 or higher? If it’s not supported, what options do we have? Can we install ZVM on a new server, complete the pairing, and import VPGs?
-
People: 2
Replies: 1 - November 14, 2019
-
SQL Database on an external SQL
The ZVM for our production site has its SQL Database on an external SQL 2008 R2 SP1. We need to migrate this to a newer SQL 2016 SP2 server as the 2008 server is due to be decommissioned. Do you have a KB or guide for this process?
-
People: 3
Replies: 3 - November 14, 2019
-
operations from live failover to commit
Is it possible to perform the following three operations from live failover to commit? 1. Power on / off the recovery VM using vCenter 2.IOPS limit setting of recovery VM using vCenter 3. Upgrade VMwareTool of recovery VM using vCenter
-
People: 2
Replies: 1 - November 14, 2019
-
vMotion
Please could you advise how I move the storage for a ZVRA to a different datastore in VMWare, can I just storage vMotion or will this break replication?
-
People: 3
Replies: 2 - November 14, 2019
-
Zerto DR
We have installed ZVR 7.0u2 for Datacenter migration , post migration we are planning to use the same ZVR for DR purposes. Please confirm us that we can use same ZVR with site pairing option to configure for DR activity.
-
People: 2
Replies: 1 - November 14, 2019
-
Exporting VPG settings
Is it possible for a tenant to export VPG settings from their ZVM?
-
People: 2
Replies: 1 - November 13, 2019
-
Supported Portal Languages
I am being asked by our product team about different language portal support within Zerto. More directly around the ZVM and ZSSP. Are there options available to change the display language within these portals outside of the installed language of the OS these run on? Could a client accessing the ZSSP switch for English to […]
-
People: 4
Replies: 3 - November 12, 2019
-
Zerto Upgrate from 6.U1 to 6.5Ux
which one (ZVRA or ZVM) should upgrade first?
-
People: 2
Replies: 1 - November 12, 2019
-
Vmware Cross Version Replication
Is there an issue with replicating from esxi5.5 to esxi6.7?
-
People: 3
Replies: 3 - November 12, 2019
-
How can I access SSH to VRA?
Hi I tried to access SSH to VRA by using PUTTY I put SSH.ppk file to Auth and ip and root for host ID but failed “Authenticating with public key “imported-key” “Unable to load private key (createkey failed)” Please tell me what did I miss
-
People: 2
Replies: 3 - November 12, 2019
-
SQL Express Upgrade Problem
Now Zerto 7.5 for vSphere is running on the environment, the db is running in Sql 12.0.2000.8 (2014) Express Edition. Now I plan to upgrade sql express 2014 to Sql express 2014 SP2 (12.0.5000.0 (2014 SP2)), does it support ? Remark: The SQL express and ZVM is running in same host.
-
People: 2
Replies: 1 - November 12, 2019
-
end of general support for 6.5 and technical guida
Hello, Looking at this document (http://s3.amazonaws.com/zertodownload_docs/Latest/Zerto%20Virtual%20Replication%20Product%20Version%20Lifecycle%20Matrix.pdf), it seems that version 6.5 is past the “end of general support” phase. Could you let us know exactly what we lose by staying on this version? The document also mentions a “technical guidance phase”. What exactly is that? Thanks,
-
People: 2
Replies: 1 - November 11, 2019
-
Granular permissions within Zerto
I am trying to sort out how we achieve granular permissions within Zerto and I am not able to understand where the settings are configured.
-
People: 2
Replies: 1 - November 11, 2019
-
Bitmap sync end time?
Hi guys is there a way to know/find out when a bitmap sync finish? I have this customer who has some Bitmap Sync during the night which take about 1 to almost 3 hours – I know there is something else going on – but while they increase link speed to at least 500MB they […]
-
People: 4
Replies: 7 - November 10, 2019
-