it’s worth to ask even when it’s something SQL related but maybe someone already experienced it
I have this customer 1.2 TB SQL VM we did a failover to Site B, VM stayed there for a day VM worked great in Site B, so we scheduled a failback and everything when fine as well but next day customer found the SQL jobs scheduled to run every 10 seconds where running every 2 hours instead so customer had to re-create the SQL jobs and asked me about it
has someone had similar experience with SQL?
thanks
Zerto doesn’t touch the OS of a VM by default. If any scripting was run with the failover/failback that would change those settings, or someone changed the job schedule while the VM was running at site B (which would have replicated back to site A) would be the only assumed reason.
thanks it was this
server started with UTC time and SQL took that time so all jobs were out dated when the task started
so we had to set SQL service as manual and start the SQL service after server sync time with Active directory instead of UTC